Electricity production hybrid power plants

The electricity production hybrid power plants consist the fundamental subject of study, research and development of Aeolian Land S.A. Since October 2011, the following projects have been implemented:

1. Design, siting, dimensioning, economic evaluation, operation simulation and application submission for the issuance of the first required Power Production License for a wind park – pumped hydro storage plant of 55MW guaranteed power in Crete, Greece – December 2011. See indicative technical features.

2. Design, siting, dimensioning, economic evaluation, operation simulation and application submission for the issuance of the first required Power Production License for a wind park – pumped hydro storage plant of 36MW guaranteed power in Crete, Crete – December 2012. See indicative technical features.

3. Design, siting, dimensioning, economic evaluation, operation simulation and update of the application submitted for the issuance of the first required Power Production License for a wind park – pumped hydro storage plant of 4MW guaranteed power in Kasos, Dodecanese, Greece – June 2013. See indicative technical features.

4. Design, siting, dimensioning, economic evaluation and operation simulation of a wind park – photovoltaic station – electrochemical batteries hybrid power plant for the island of Agios Efstratios, North Aegean Sea, Greece – February 2014. See indicative technical features.

5. Design, siting, dimensioning, economic evaluation, operation simulation and application submission for the issuance of the first required Power Production License for a wind park – photovoltaic station – electrochemical batteries hybrid power plant of 1MW guaranteed power in the island of Kastelorizo, Dodecanese, Greece – March 2014. See indicative technical features.

6. Design, siting, dimensioning, economic evaluation, operation simulation and update of the application submitted for the issuance of the first required Power Production License for a wind park – pumped hydro storage plant of 20MW guaranteed power in Samos, Eastern Aegean Sea, Greece – June 2014.

7. Design, siting, dimensioning, economic evaluation, operation simulation and update of the application submitted for the issuance of the first required Power Production License for a wind park – pumped hydro storage plant of 2,5MW guaranteed power in Astypalaia, Dodecanese, Greece – September 2014. See indicative technical features.

8. Design, siting, dimensioning, economic evaluation, operation simulation and update of the application submitted for the issuance of the first required Power Production License for a wind park – pumped hydro storage plant of 2,5MW guaranteed power in Sifnos, Cyclades, Greece – September 2016. See indicative technical features.